Budget planning tool

Build a budget from your scope and your quotes.

Keep site work, delivery, utilities, fees and contingency beside the shell price. The worksheet makes no market-price claim.

Start from a project study

The project supplies the task context. No prices, quotes or build method are invented. Choosing a study here only previews its identity. The tool below continues to use your current private project until you explicitly replace it.

Browse projects to inspect their sources, diagrams and resource limits before adopting an example.

Your quotes and allowances

Enter figures you actually receive.

Empty fields remain unknown. This worksheet does not fill a price gap with a market estimate.

One project · coverage and budget

Keep the material scope with this candidate.

Nominal footprint: 120 sq ft. Coverage inputs and waste are saved separately for each candidate; unit rates are shared. Editing here updates Budget and your brief. Blank means unknown, not zero.

Restoring project…

Checking this browser for a saved project…

Edit coverage dimensions, openings and roof factor

floor

Before waste: 120 sq ft

Example planning assumption
Unknown — enter a value

With waste: 120 sq ft

Material subtotal: Unknown

Net wall

Before waste: 308 sq ft

Example planning assumption
Unknown — enter a value

With waste: 308 sq ft

Material subtotal: Unknown

roof

Before waste: 134.4 sq ft

Example planning assumption
Unknown — enter a value

With waste: 134.4 sq ft

Material subtotal: Unknown

Known material subtotal: Unknown.

Only calculable entries are included. This subtotal stays separate from supplier quotes to avoid double counting. It is not a complete project cost, purchase quantity or structural bill of materials.

Review these figures in my brief

Build path comparison

Compare responsibilities before comparing totals.

Swipe the comparison left and right to see every build path.

ScopeDIYKitPrefabContractor
Price certaintyYou scope and buyQuote after optionsQuote after site/deliveryQuote after scope
LaborYour responsibilityYour or hiredUsually included - confirmDefined in contract
CustomizationHighestLimited by kitModel dependentScope dependent
FoundationYour responsibilityConfirm scopeConfirm scopeConfirm scope
Delivery / assemblyYour responsibilityConfirm scopeConfirm access and setupConfirm scope
Electrical / interiorYour responsibilityUsually separateUsually separateDefine in scope
Local approvalYour responsibilityYour responsibilityYour responsibilityConfirm responsibility

Use written product and contractor scopes to replace these prompts. Local approval responsibility must be confirmed for your site.

Change this project?